Dr. Shanker Adawal

Projects & Achievements

The list of projects conducted by the organisation:

Project – 1: Implementation of Resettlement Action Plan (RAP) for Thane district of Maharashtra state for Mumbai – Ahmedabad High-Speed Project, September 2020 to July 2021, Name of Client: National High-Speed Rail Corporation Ltd.

Project – 2: “Development & Improvement of two/four lane road corridors of Panitanki – Bagdogra – Shibmandir – Medical More – Naukaghat – Fulbari Section of the Asian Highway 02 (AH-02) in the State of West Bengal” under SASEC Road Connectivity Investment Program, March 2015 to August 2017, Name of Client: PW (Roads) Directorate, Govt. of West Bengal, Siliguri (Job No. AH- 02-WB-2014-15-379)

Project – 3: “Development & Improvement of Two/Four lane road corridors of Chengrabandha – Indiramore – Dhupguri – Gairkata – Birpara – Madarihat – Hasimara – Jaygaon Section of the Asian Highway 48 (AH-48) in the State of West Bengal” under SASEC Road Connectivity Investment Program (Job No. AH (48)-WB-2014-15-380), March 2015 to March 2018, Name of Client: PW (Roads) Directorate, Govt. of West Bengal, Jalpaiguri

Project – 4: APIIC – VCIC – Selection of NGO for Implementation of Resettlement Plan (RP) for the sub projects under Visakhapatnam Chennai Industrial Corridor Development Project (VCICDP) Visakhapatnam Node – APIIC/08A & 09A, August 2021 to August 2023 (24 Months), Name of Client: Andhra Pradesh Industrial Infrastructure Corporation

Project – 5: APIIC – VCIC – Selection of NGO for Implementation of Resettlement Plan (RP) for the sub-projects under Visakhapatnam Chennai Industrial Corridor Development Project (VCICDP) Chittoor Node – APIIC/06A, August 2021 to August 2023 (24 Months), Name of Client: Andhra Pradesh Industrial Infrastructure Corporation

Project – 6: Consultancy Services for NGO/Agency to assist PIUs in Resettlement Plan Implementation for Asian Development Bank (ADB) Tranche 2 funded projects for Rajasthan State Highway Road Investment Programme (RSHIP), January 2021 to January 2024 (36 months), Name of Client: Office of the Additional Chief Engineer (PPP), PWD Rajasthan, Jaipur

Project – 7: Procurement of NGO for Implementation of Resettlement Plan (RP) for SH-58 (Udakishanganj – Bhatagama) Road under BSHP-III, August 2019 to November 2021, Name of Client: Bihar State Road Development Corporation Limited

Project – 8: Selection of Consultants / NGOs to assist in the Implementation of Resettlement Action Plan for Improvement to 2 lane with paved shoulder of NH-40 between Shillong to Dawki section (design km. 0.000 to km. 71+520) and the section of NH-44/NH-40 (design km. 0+000 to km. 0+800) Guwahati – Shillong – Jowai Road, Design Length – 72.32 km in Meghalaya under JICA loan assistance (2nd Phase) Engineering, through an EPC Contract, July 2019 to Ongoing, Name of Client: National Highways &Infrastructure Development Corporation Ltd.

Project – 9: Selection of Consultants/NGOs to assist in Implementation of Resettlement Action Plan for widening to Two with Geometric Improvements of Tura Dalu Road Km. 85.00 to 95.00 & 101.00 to 145.00 to 2-lanes with paved shoulder of Tura-Dalu section of NH-51 in the state of Meghalaya on EPC mode with JICA Loan Assistance, August, 2018 to Ongoing, Name of Client: National Highways &Infrastructure Development Corporation Ltd,

Project – 10: UP Major District Road Improvement Project from ADB Loan – Hiring of NGO Services for Facilitating Implementation of Resettlement Plan, October, 2017 to continue (EOT Period), Name of Client: Office of the Chief Engineer, Externally Aided Projects, PWD, Lucknow

Project – 11: “Selection of Organisation to assist in Resettlement Plan Implementation for RSHIP Tranche-1”. (Package-1: SH-74, SH-74A, SH-19C, Package-2: SH-16, Package-3: SH-60, SH-100, SH- 8, SH-19, SH-60, SH-82A, Package-4: MDR-103, SH-6A, SH-74, SH-69, SH-20, SH-20A and Package-4: SH-13, SH-13B, SH-22), April 2017 to ongoing (36 months), Name of Client: Office of the Additional Chief Engineer (PPP), PWD Rajasthan, Jaipur

Project – 12: “Implementation of Resettlement Plan (RP) & Indigenous Peoples Plan (IPP) for the “Construction of Imphal Kangchup Tamenglong Road” under SRCIP Loan No. 3118 – IND, Tranche- 1 in the state of Manipur, September 2016 to Ongoing (36 Months), Name of Client: Office of the Project Director, External Aided Project (EAP), Public Works Department, Government of Manipur Project-13: “Implementation of the Resettlement Action Plan (RAP) for Rehabilitation and Upgrading to 2 lanes/2 lane with paved shoulders configuration of Bankura – Purulia section of NH-60A in the state of West Bengal”, April 2015 to Ongoing with EOT, Name of Client: Ministry of Road Transport and Highways, Government of India

Project – 14: Implementation of the Resettlement Action Plan (RAP) for Rehabilitation and Upgrading to 2 lanes/2 lane with paved shoulders configuration of Sitamarhi – Jaynagar – Narahia section (km. 40 to Km 219.945) of NH-104 in the state of Bihar”, January 2015 to Ongoing with EOT, Name of Client: Ministry of Road Transport and Highways, Government of India